
EV Charger Installation in Milton and the South Shore
Level 2 home charging installed by licensed Massachusetts electricians, permitted, inspected, and done right the first time.
What you need to know.
Public charging is fine until you need it. A Level 2 charger in your garage or driveway turns overnight into a full battery, adding roughly 25 to 40 miles of range per hour instead of the 4 or 5 you get from a standard outlet. Boston Light & Power installs EV chargers for homeowners throughout Milton, Quincy, Braintree, Weymouth, Hingham, Scituate and Cohasset.
Tesla Wall Connector, ChargePoint, JuiceBox, Emporia, Grizzl-E, Autel and the charger that shipped with your car. If you have not bought one yet, tell us your vehicle and daily mileage and we will recommend the right amperage instead of overselling you.
For a full homeowner's guide to chargers, rebates, and panel requirements, read EV Charger Installation: What South Shore Homeowners Should Know.
The work, in detail.
Panel load calculation
We confirm your existing service can carry the charger safely before anything gets mounted.
Dedicated 240V circuit
Sized to your charger and run cleanly to the garage, driveway or carport.
Hardwired or NEMA 14-50
Whichever your vehicle and charger call for, installed to code.
Permits and inspection
Full permitting with your city or town, and we meet the electrical inspector.
Outdoor and detached garages
Weather-rated equipment and feeders run overhead or underground.
Setup walkthrough
We walk you through the charger app, amperage settings and scheduled charging before we leave.
How it works.
Site visit and load calc
We look at the panel, run the load calculation, and walk the feeder route with you.
Charger recommendation
Tell us your vehicle and daily mileage and we recommend the right amperage instead of overselling you.
Permit filed
An electrical permit and inspection are required in Massachusetts. We pull it as part of the job.
Install, usually in a day
Most straightforward installs finish in 3 to 5 hours, including weather-rated outdoor work.
Inspection and rebate paperwork
We meet the inspector, then hand you the itemized invoice and equipment details your rebate application needs.
No surprise invoices.
Every EV charger install is quoted flat rate before we start. Feeder length, indoor versus outdoor mounting and whether your panel or service needs upgrading are what move the price, so we quote those together in one visit rather than billing two mobilizations.
Common questions.
How long does an EV charger installation take?+
Most straightforward installs are done in a single day, often in 3 to 5 hours. Longer conduit runs or a panel upgrade can push it to two days.
Do I need a permit for an EV charger in Massachusetts?+
Yes. An electrical permit and inspection are required. We pull it and meet the inspector so you do not have to.
Can you install a charger in a detached garage?+
Yes. We run the feeder underground or overhead and install weather-rated equipment for outdoor conditions.
Ready to get it done? Let's talk.
Free quotes, straight answers, real people. Send a quick message or give us a call. Takes about 30 seconds, no pressure and no obligation.
Call (857) 855-7899